Project Alignment

The proposed 54-inch-diameter pipeline will tie into the existing SARI Line just upstream of the existing metering station at the Green River Golf Club. The pipeline will then cross the golf course to the south bank of the river where it will be located under the existing bikeway before proceeding downstream through Featherly Park. The new pipeline will connect to the existing SARI Line behind SAVI Ranch. Open-cut excavation and micro-tunneling construction methods will be used to install the new pipeline and facilities.

SARI ALIGNMENT