Indianapolis Ave. to Adams Ave.

OCFCD Facility No. D02
Indianapolis Ave. to Adams Ave.

Location: Huntington Beach

District: Supervisorial District 2


Project Information

This project was an increment of the channel improvement program for the Talbert Valley Flood Control Improvements approved by the District’s Board on March 24, 1987. This improvement project improved over 2500 feet of deficient channel enabling it to convey 100-year storm runoff.

The subject reach of Talbert Channel previously existed as a trapezoidal-earthen channel originally designed to convey the storm runoff generated by a 10-year storm event. The earthen channel was replaced by a 110 foot wide, soft-bottom (earthen), vertical wall channel. The vertical channel walls were constructed of 13-14 foot high steel sheet piles. The overall length of the sheet piles are 36 feet where approximately 25-26 feet of the pile is embedded into the earth.

The steel piles are protected from the harsh saltwater environment by a special corrosion resistant coating and a process/system called cathodic protection.


D02 Map
View PDF


Start Date: 04/2000

Completed Date: 07/2001

Quantities