Adams Ave. to Yorktown Ave.

OCFCD Facility No. N01
Adams Ave. to Yorktown Ave.

Location: Huntington Beach

District: Supervisorial District 2


Project Information

This project was an increment of the channel improvement program for the Talbert Valley Flood Control Improvements approved by the District’s Board on March 24, 1987. This particular improvement project completed 100-year channel improvements and conveyance for the Talbert Channel (D02) and Fountain Valley Channel (D05), its upstream tributary.

The subject reach of Talbert Channel previously existed as a trapezoidal-earthen channel originally designed to convey the storm runoff generated by a 10-year storm event. The earthen channel was replaced by a 110 foot wide, soft-bottom (earthen), vertical wall channel. The vertical channel walls were constructed of 13-14 foot high steel sheet piles. The overall length of the sheet piles are 36 feet where approximately 25-26 feet of the pile is embedded into the earth.

The steel piles are protected from the harsh saltwater environment by a special corrosion resistant coating and a process/system called cathodic protection.


D02 Map
View PDF

Start Date: 07/2002

Completed Date: 07/2004


Quantities