Work consisted of reconstructing and repairing the concrete invert along a 575 feet long segment of the rectangular concrete channel. Within the 26-feet wide channel section, an 8-feet wide section was removed and replaced for most of project length. A high strength epoxy was applied as an overlay for the remaining width within this segment which required hydrodemolition prior to its application.